GEPCO • Gujranwala regionGEPCO Bill Check Online 2026
GEPCO serves Pakistan's export-manufacturing belt, and it publishes something unusual: a direct telephone number for every sub-division Customer Relations Centre, rather than a single switchboard.
Last updated: 2026-08-16
Enter the reference number above and your latest GEPCO bill loads in a few seconds — free, with no account. New to reading one? Our annotated sample bill explains every line.
Districts and towns GEPCO serves6
GEPCO distributes across upper Punjab, including:
What GEPCO covers
GEPCO covers Gujranwala, Sialkot, Gujrat, Narowal, Hafizabad and Mandi Bahauddin — a compact, densely populated and unusually industrialised corner of upper Punjab. The manufacturing here is distinctive: Sialkot's surgical instruments, sports goods and leather, Gujranwala's light engineering and home appliances, Gujrat's ceramics and fans. Much of it is export-oriented, and much of it runs in small and medium units rather than large plants.
That structure matters for the network. Instead of a handful of very large industrial connections, GEPCO serves a great many modest commercial and light-industrial ones scattered through residential areas. Load is spread rather than concentrated, and the boundary between a domestic feeder and a commercial one is blurrier here than in Faisalabad or Karachi.
Population density is high and settlements sit close together, so feeders are relatively short and fault restoration is comparatively quick — an advantage GEPCO has over the large rural territories to its south and west.
How GEPCO came about
GEPCO was incorporated on 25 April 1998 (certificate L09498), commenced business on 5 June 1998 and was granted its first distribution licence on 23 April 2002, in the unbundling of WAPDA's power wing, taking over the network of the former Gujranwala Area Electricity Board. Serving an export-manufacturing region gives its reliability a direct economic weight: an outage in Sialkot is a missed shipment as often as an inconvenience.
- Consumers: 4.39 million, per its NEPRA licence determined 9 May 2023. GEPCO’s homepage counters (4,541,103 domestic, 458,021 commercial, 88,176 industrial, 57,417 tubewell) carry no date.
Reading a GEPCO bill
GEPCO bills follow the standard PITC layout, with the reference number at the top-left and the readings panel showing previous and current meter readings alongside units consumed.
In this region a great many premises are mixed-use — a workshop on the ground floor and a home above, on one connection. The tariff code in the header determines which rate schedule applies to the whole connection, and a mixed-use premises billed on a commercial code will pay commercial rates for the domestic portion too. If your usage pattern has changed, the tariff code is the line to check.
Paying a GEPCO bill
Gujranwala, Sialkot and Gujrat all have dense banking networks, and every mainstream channel works: JazzCash, Easypaisa, bank apps, ATMs and counter payment. Exporters and larger workshops typically pay through business banking, which posts on the same timetable as a counter payment.
Counter payments normally post the same working day; wallet and app payments take one to two days to appear against the reference number.
Outages and load management on GEPCO
Because settlements are close together and feeders comparatively short, GEPCO faults are usually localised and found quickly — a failed transformer affects a few streets rather than a district. The trade-off is that dense mixed-use load puts distribution transformers under sustained stress, and transformer failure is the most common fault type rather than line damage.
For a small manufacturing unit, an unplanned outage is lost production, which is why the direct sub-division numbers GEPCO publishes are genuinely useful — reporting to the sub-division that owns the transformer is faster than routing through a national line.
- Where the schedule is published: GEPCO publishes it at www.gepco.com.pk/ElectricLoad.aspx
GEPCO tariff bands
GEPCO does not set your rate — tariffs are notified by NEPRA and applied by every distribution company alike. What GEPCO does is read your meter and bill you in the bands below.
Domestic rates run from Rs 10.54/unit (protected, first 100 units) to Rs 47.20/unit (unprotected, above 700), plus a fixed charge per kilowatt of sanctioned load. The band most households sit in, 101–200 units unprotected, is Rs 28.91/unit.
Crucially, billing is not telescopic: an unprotected consumer pays the rate of the band their month reaches on every unit. See the full schedule, fixed charges and the adjustment in force →
S.R.O. 279(I)/2026 — NEPRA decision of 11 February 2026, effective 2026-02-12. S.R.O. 42(I)/2026 (Schedule of Tariff), as modified by S.R.O. 279(I)/2026 of 12 February 2026
How to complain to GEPCO
GEPCO publishes a direct line for each sub-division Customer Relations Centre, which reaches the office that actually owns your transformer.
GEPCO head office
GEPCO Head Quarters, 565-A Model Town, G.T. Road, Gujranwala — CEO office 055-9200507, PABX 055-9200519-26.
GEPCO circle & area offices
- Model Town Sub-Division, Gujranwala-1055-9200545Model Town, Gujranwala
- City Sub-Division, Gujranwala-1055-9200579Gujranwala city
- Civil Lines Sub-Division, Gujranwala-2055-9200543Civil Lines, Gujranwala
- Sheranwala Bagh Sub-Division, Gujranwala-2055-9200806Sheranwala Bagh
- Kamoke Sub-Division No. 1055-6815029Kamoke
- Nowshera Virkan Sub-Division No. 1055-6760015Nowshera Virkan
GEPCO publishes a direct number for every sub-division Customer Relations Centre — the list above is a sample of the Gujranwala and Kamoke circles.
Checked against GEPCO's site, 2026-08-16. Wrong number? Tell us.










